CIL upgrades it’s Dumpers
May 26th, 2019 11:31 am | By ThenewsmanofIndia.com | Category: LATEST NEWS
(THE NEWSMAN OF INDIA)
CIL in a new initiative is upgrading old dumpers with the help of the Original Equipment Manufacturer (OEM). In a pilot project in Northern Coalfields Limited (NCL), the Central Workshop (CWS) in association with the Original Equipment Manufacturer (OEM), has made phenomenal changes in the main frame, dump body guide, operator’s cabin, hydraulic tank and parking brake system of the dumpers. These changes have led to better operator comfort, improved reliability and enhanced safety features.
Two dumpers have been fully upgraded at the CWS of NCL and are deployed at Block-B coal project showing a robust performance. Buoyant, NCL has sent another three dumpers for upgradation.
Government News
- REC AVAILS SACE-COVERED GREEN LOAN FACILITY FOR JPY 60.536 BILLION 04/25/2024
- REC signs agreement with CVPPPL for ₹1869 Cr term loan 04/24/2024
- G Krishnakumar CMD, BPCL, Onshore 1 block in Abu Dhabi 04/24/2024
- Vice President Confers `Outstanding PSU of the Year’ Award on HAL 04/24/2024
- REC’s Green Energy Endeavours showcased at the World Energy Congress 2024 04/23/2024